Machine Entry Actual Yds & Actual Per Line are optional β leave blank if same as standard
Total Planned
β
yds all machines
Total Actual
β
yds produced
Day Output
β
yds day shift
Night Output
β
yds night shift
Efficiency
β
actual vs planned
Std Output/Line
β
yds avg per line/shift
Actual Output/Line
β
yds avg per line/shift
Variance/Line
β
actual vs std per line
Downtime
β
hrs combined
Machines Active
β
of total
Machine Breakdown
Select a date to load data
to
Set date range and search
Machine Configuration β Set size, unit, lines and standard output per line per shift for each machine. Production data is not affected.
GLOBAL DEFAULT β STD OUTPUT PER LINE/SHIFT (yds)
yds per line per shift
DEFAULT UNIT FOR NEW MACHINES
Machines
| MACHINE | SIZE | UNIT | LINES | STD OUTPUT/LINE/SHIFT (yds) β | STD TOTAL/DAY |
|---|
Export to Excel (.xlsx) β Choose what to export and the date range. The file will have multiple sheets: Daily Report, Summary, and Machine Config.
Daily Report
Full breakdown for a single date β all machines, both shifts, per-line output
Date Range Report
Multi-day history β one row per machine per day with totals and efficiency
SELECT DATE
INCLUDE IN EXPORT